Recent Projects

|
.jpg)
|

|

|
|
TWO
TOWNS TRAIL
The Two Towns Trail is an 8 kilometre track
linking Warragul and Drouin, officially opened by the Premier John Brumby on
the 15 June 2009.
VicRoads provided $1.5 million to the Baw Baw
Shire Council to manage the project.
The trail is the largest physical activity
track in the Baw Baw Shire providing a 3 metre wide concrete pathway with
boardwalks linking the Shire’s two major towns and providing recreational
opportunity for the whole community.
|
|
|
|
|
|
|
LATROBE REGIONAL
AIRPORT
Works at the Latrobe Regional
Airport included taxiway
extensions, the construction of emergency assembly areas and general access
roads to the airport industrial area.
Completed in February 2009 works were
valued at approximately $.75 million.
|
 |
 |

|
|
|
MASON STREET CAR PARK, WARRAGUL
Completed in May 2009 this job was Design and
Construct and now provides an additional 98 parking bays in the ever-growing
Warragul CBD.
With clever design modifications, several
old elm trees were able to be retained,
enhancing the beauty of the car park and new street lighting was
incorporated with the works
|

|
|
|
|
|
CARPARK,
BOARD WALKS & PICNIC AREA AT ADA
TREE
The Department of
Sustainability & Environment (DSE) in conjunction with the Baw Baw Shire Council
commissioned Sure Constructions to undertake improvement works on the car park/picnic
area and to construct new board walks at the Ada Tree, Bunyip State Forrest, a
popular tourist attraction in the Shire.
The works were carried
out in an environmentally sensitive area and completed in August 2008. Cost :
$189,000
|

|
|

|

|
|
DROUIN
TOWNSCAPE
Baw Baw Shire awarded Stages 1 – 6 of the
Drouin CBD Townscape to SURE Constructions. Works involved underground
drainage, paving and beautification works, landscaping and allowance for future
underground power for the growing CBD of Drouin.
The project was mostly completed overnight so as
to have a minimal impact on traders and business during the day.
|
|
|
|
|
|
HEADS
ROAD, CATANI ROAD
REHABILITATION
Road rehabilitation at Heads Road Catani
involved profiling of the existing road pavement plus the addition of crushed
rock with widening slots installed, followed by cement stabilisation for a
distance of approximately 4 kilometres.
This upgraded a narrow 3.5 metre road to a
7.0 metre wide and much safer roadway.
Works were completed on behalf of Cardinia
Shire Council.
|

|

|

|
|
|
NORTHFIELDS
SUBDIVISION & WETLANDS, TRARALGON
The project was unique in liaising between
local developers, a local school, Latrobe City Council, Gippsland Water and
other authorities.
This job required high level Project
Management to bring the whole job in on budget and to meet the needs of all
stakeholders.
Completed March 2008.
|

|
|
|
|
|
NOBELIUS HERITAGE
PARK, DRAINAGE TREATMENT
The existing
drainage in the Nobelius Heritage Park
was eroding open channels, causing flooding and the outfall was discharging
into Emerald Lake Park,
then on to Melbourne Water’s reservoir.
Nobelius
Heritage Park Water Sensitive Urban Design Drainage Works was a pilot project completed
for Cardinia Shire Council. These innovative works were funded by Melbourne
Water.
The end result
was a series of swales,
raingardens and rock chutes installed to improve storm water quality and
prevent soil erosion as well as enhancing the natural environment.
|
|